To legally start earthwork on regulated Utah construction sites, you need both a site-specific Stormwater Pollution Prevention Plan (SWPPP) and an active SWPPP permit. At Cearley SWPPP, we handle the entire Utah Division of Water Quality (DWQ) permitting lifecycle so builders, developers, and contractors across Salt Lake City and other parts of Utah avoid costly stop-work orders.
With over 35 years of excavation and construction experience, our certified team prepares your paperwork, files your Notice of Intent (NOI) through the EPA NeT CGP system, and manages renewals through project closeout. Contact us to learn more or schedule an appointment with our team!
Many contractors confuse the written plan with the state permit application, yet Utah regulations require both before breaking ground.
| Feature | SWPPP (The Plan) | Notice of Intent (NOI) |
|---|---|---|
| Primary Purpose | Blueprint for on-site erosion and sediment control | Formal application for state permit coverage |
| Where It Lives | Maintained on-site or digitally in SW2 software | Filed online via EPA NeT CGP portal |
| Who Reviews It | Local municipality (MS4) and site inspectors | Utah Division of Water Quality (DWQ) |
Under Utah DWQ regulations, construction stormwater general permit coverage is mandatory for any project that disturbs one acre or more of land. Coverage is also required for smaller sites under one acre if the lot is part of a larger common plan of development or sale, such as a residential subdivision or commercial complex.
Utah issues two primary construction stormwater permits depending on your project type:
Navigating federal and state portals delays projects when forms are incomplete. Our RSI, RSW, and RSR certified specialists manage every step of the permitting timeline for you.
The Utah Division of Water Quality charges roughly $150 per year for Construction General Permit (UTRC00000) and Common Plan Permit (UTRH00000) coverage. You must pay this fee online before DWQ issues your Authorization to Discharge, and renew it annually until the project is terminated.
Once your SWPPP is approved by your local municipality (MS4) and your NOI and fee are submitted through EPA NeT CGP, Utah DWQ typically issues your UPDES ID and Authorization to Discharge immediately upon electronic payment confirmation.
No. Under Utah DWQ rules, the legal site owner or primary operator must electronically sign and certify the NOI inside the NeT CGP system. Cearley SWPPP prepares the entire filing, walks you through account setup, and sets everything up so you only need to click to sign.
If you do not submit an NOT through NeT CGP after achieving final site stabilization, your UPDES permit remains active. You will remain legally liable for ongoing weekly or bi-weekly inspections and will continue to be billed annual renewal fees by the state.
Do not let confusing state portals or missing paperwork stall your excavation schedule. Whether you need a new SWPPP permit under UTRC00000, residential lot coverage under UTRH00000, or help closing out an expired filing, Cearley SWPPP keeps your project compliant from day one to final stabilization. Serving contractors across Salt Lake City, Davis County, Utah County, and statewide, we pair fast permit management with digital SW2 compliance tracking. Call Cearley SWPPP today at (801) 589-9806 or contact us online to have our team file and manage your Utah NOI.