SWPPP Permit Filing & Notice of Intent (NOI) Coverage in Utah

To legally start earthwork on regulated Utah construction sites, you need both a site-specific Stormwater Pollution Prevention Plan (SWPPP) and an active SWPPP permit. At Cearley SWPPP, we handle the entire Utah Division of Water Quality (DWQ) permitting lifecycle so builders, developers, and contractors across Salt Lake City and other parts of Utah avoid costly stop-work orders.

With over 35 years of excavation and construction experience, our certified team prepares your paperwork, files your Notice of Intent (NOI) through the EPA NeT CGP system, and manages renewals through project closeout. Contact us to learn more or schedule an appointment with our team!

SWPPP vs. Notice of Intent (NOI): What Is the Difference?

Many contractors confuse the written plan with the state permit application, yet Utah regulations require both before breaking ground.

  • Stormwater Pollution Prevention Plan (SWPPP): This is the site-specific technical document kept on your job site. It outlines your Best Management Practices (BMPs), erosion controls, site maps, and inspection schedules.
  • Notice of Intent (NOI): This is the official online application submitted to request permit coverage under Utah Pollutant Discharge Elimination System (UPDES) rules. Filing an NOI notifies the state that your site will follow strict SWPPP requirements to prevent polluted runoff.
FeatureSWPPP (The Plan)Notice of Intent (NOI)
Primary PurposeBlueprint for on-site erosion and sediment controlFormal application for state permit coverage
Where It LivesMaintained on-site or digitally in SW2 softwareFiled online via EPA NeT CGP portal
Who Reviews ItLocal municipality (MS4) and site inspectorsUtah Division of Water Quality (DWQ)

When Is a SWPPP Required in Utah?

Under Utah DWQ regulations, construction stormwater general permit coverage is mandatory for any project that disturbs one acre or more of land. Coverage is also required for smaller sites under one acre if the lot is part of a larger common plan of development or sale, such as a residential subdivision or commercial complex.

Utah issues two primary construction stormwater permits depending on your project type:

  • UPDES Construction General Permit (UTRC00000): Covers all construction projects disturbing one acre or more, as well as commercial or multi-lot projects under one acre within a common plan of development.
  • UPDES Common Plan Permit (UTRH00000): Covers single residential lots disturbing one acre or less that are part of a subdivided common plan of development.

How to File an NOI and Manage Utah Permit Coverage

Navigating federal and state portals delays projects when forms are incomplete. Our RSI, RSW, and RSR certified specialists manage every step of the permitting timeline for you.

  1. Confirm SWPPP Readiness: We verify that your site-specific SWPPP meets local Municipal Separate Storm Sewer System (MS4) and state standards before submission.
  2. Submit the NOI in NeT CGP: We prepare and submit your notice of intent stormwater application through the EPA NeT CGP online system and coordinate your signature as the site operator or owner.
  3. Receive Authorization to Discharge: Once the roughly $150 annual state permit fee is paid, Utah DWQ issues your UPDES ID and official Authorization to Discharge so earthwork can begin.
  4. Track Renewals and Closeout: Permits remain active for one year and require annual renewal until construction finishes. Once final stabilization is achieved, we file your Notice of Termination (NOT) within 30 days to end your liability and stop recurring fees.

Frequently Asked Questions

How much does a Utah SWPPP permit cost?

The Utah Division of Water Quality charges roughly $150 per year for Construction General Permit (UTRC00000) and Common Plan Permit (UTRH00000) coverage. You must pay this fee online before DWQ issues your Authorization to Discharge, and renew it annually until the project is terminated.

How long does it take to get an Authorization to Discharge in Utah?

Once your SWPPP is approved by your local municipality (MS4) and your NOI and fee are submitted through EPA NeT CGP, Utah DWQ typically issues your UPDES ID and Authorization to Discharge immediately upon electronic payment confirmation.

Can a consultant sign the NOI for my company?

No. Under Utah DWQ rules, the legal site owner or primary operator must electronically sign and certify the NOI inside the NeT CGP system. Cearley SWPPP prepares the entire filing, walks you through account setup, and sets everything up so you only need to click to sign.

What happens if I forget to file a Notice of Termination (NOT)?

If you do not submit an NOT through NeT CGP after achieving final site stabilization, your UPDES permit remains active. You will remain legally liable for ongoing weekly or bi-weekly inspections and will continue to be billed annual renewal fees by the state.

Let Cearley SWPPP Handle Your Utah Permit Filing

Do not let confusing state portals or missing paperwork stall your excavation schedule. Whether you need a new SWPPP permit under UTRC00000, residential lot coverage under UTRH00000, or help closing out an expired filing, Cearley SWPPP keeps your project compliant from day one to final stabilization. Serving contractors across Salt Lake City, Davis County, Utah County, and statewide, we pair fast permit management with digital SW2 compliance tracking. Call Cearley SWPPP today at (801) 589-9806 or contact us online to have our team file and manage your Utah NOI.